Release Dates

Here is a list of release dates for all of the files available. They are listed with the latest first:

Landscape 1-10 Pack 12/12/2025

Landscape 11-20 Pack 12/12/2025

Glyn Arch Jr. (standard Tile Size) 12/11/2025

XL- Glyn Arch "Grip" texture added: 12/10/2025

Terrain 11-13: 4/18/2025

FG Rock 1-20: 4/11/2025

OBSTACLE 1-5:  4/3/2025

T ROCK 1-3: 3/29/2025

TERRAIN 10: 3/19/2025

M ROCK 11-20: 3/17/2025

TERRAIN 9: 3/6/2025

SUPPORT PACK: 3/5/2025

TERRAIN 1-8 : 2/2025

M ROCK 1-10: 2/2025

S ROCK 1-65: 2/2025

TEETER TOTTER: 2/2025

BRIDGE PACK: 2/2025

TRIM PACK: 2/2025

F ROCK 1-20 2/2025

SCALED RTI RAMP 1/2025

30 and 40 deg pack 1/2025

Surface 1-20: 1/2025